After severe rainfall it became evident that the bunkers at Houghton Golf Club were suffering from excessive water run-off, contamination as well as erosion problems. Fairway bunkers on holes 1 and 5 and greenside bunkers on holes 6 and 7 were selected for the Bunkertac
Blair Atholl Bunker Stabilization – Hole 3
on-course-solutions2018-02-22T12:53:28+00:00This Bunker at Hole 3 at Blair Atholl was one of the Bunkers which On-Course rehabilitated with Bunkertac. The process as with all 11 Bunkers which On-Course was contracted to do included: removal of sand, removal of sand mat, trimmed edges, prepared surface, stabilized bunker and edges.
Ernie Els Nondela Hydro Seeding Case Study
on-course-solutions2018-02-19T20:52:00+00:00Having already seen our results at Serengeti, the Ernie Els Design Team in conjunction with WBHO placed their order and commissioned On-Course to apply Hydrotac™ for hydro seeding of the bunker complexes and Bunkertac™ for the Bunker lining...
Cart Path Construction
on-course-solutions2020-06-30T10:59:41+00:00A cart path is a small road. On-Course Solutions applies the same road building methods to its cart path construction, adding a technologically advanced soil stabilizer to the insitu soil which allows for a superior result of a permanent base layer...
Hydro Seeding with Hydrotac
on-course-solutions2018-02-15T20:47:10+00:00The hydro seeding of a golf course has always been an important, time consuming and costly component of golf course development. Typically, hydro seeding will comprise of a number of different components including...
Leopard Creek Golf Bunker Stabilization Project
on-course-solutions2018-02-20T14:45:48+00:00Johann Rupert created Leopard Creek, and with Gary Player, designed a championship 18-hole golf course as its centerpiece, which opened in 1996 as an exclusive members only club. They wanted a course which friends could play and enjoy, yet which could also test the best of players.